{"id":45960,"date":"2026-02-18T16:48:47","date_gmt":"2026-02-18T20:48:47","guid":{"rendered":"https:\/\/aladyr.net\/?p=45960"},"modified":"2026-02-18T17:42:39","modified_gmt":"2026-02-18T21:42:39","slug":"latinoamerica-2026-2027-10-proyectos-que-marcan-la-agenda-regional","status":"publish","type":"post","link":"https:\/\/aladyr.net\/en\/2026\/02\/18\/latinoamerica-2026-2027-10-proyectos-que-marcan-la-agenda-regional\/","title":{"rendered":"Latinoam\u00e9rica 2026-2027: 10 proyectos que marcan la agenda regional"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"531\" src=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/Gemini_Generated_Image_q4q4osq4q4osq4q4-2.jpg\" alt=\"\" class=\"wp-image-46006\" srcset=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/Gemini_Generated_Image_q4q4osq4q4osq4q4-2.jpg 1024w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/Gemini_Generated_Image_q4q4osq4q4osq4q4-2-300x156.jpg 300w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/Gemini_Generated_Image_q4q4osq4q4osq4q4-2-768x398.jpg 768w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/Gemini_Generated_Image_q4q4osq4q4osq4q4-2-100x52.jpg 100w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Existen proyectos claves para la transformaci\u00f3n del escenario H\u00eddrico de Latinoam\u00e9rica en los pr\u00f3ximos a\u00f1os. Se trata de una selecci\u00f3n de infraestructura pronta a entrar en operaciones y que agrega una considerable cantidad de metros c\u00fabicos a la capacidad instalada regional de desalaci\u00f3n y re\u00faso de agua.\u00a0<\/em><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">PRENSA ALADYR \/ PERIODISTA DIEGO ORTU\u00d1O. Al cierre de 2025, la capacidad instalada de desalaci\u00f3n y re\u00faso en la regi\u00f3n ha experimentado un crecimiento sostenido, impulsado tanto por la miner\u00eda en los Andes como por una demanda industrial y agr\u00edcola que se expande desde el norte de M\u00e9xico hasta el sureste de Brasil. Seg\u00fan datos de <a href=\"https:\/\/www.linkedin.com\/company\/global-water-intelligence\/\">GWI (Global Water Intelligence)<\/a>, la regi\u00f3n est\u00e1 movilizando capitales hist\u00f3ricos para asegurar que el agua deje de ser un factor limitante para el crecimiento.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Las cifras de GWI sobre el mercado latinoamericano de desalaci\u00f3n de agua de mar y salobre respaldan esta tendencia con una capacidad operativa -en l\u00ednea- que se sit\u00faa en 3.247.606 m\u00b3\/d\u00eda al cierre de 2025. Mientras, la capacidad adicional contratada para la d\u00e9cada 2021-2030 alcanza los 3.205.240 m\u00b3\/d\u00eda, lo que implica un escenario donde la infraestructura h\u00eddrica pr\u00e1cticamente se duplicar\u00e1 en el mediano plazo. Este dinamismo se traduce en una previsi\u00f3n de gasto (<em>forecasted expenditure<\/em>) de $6.076 millones para el quinquenio 2026-2030, confirmando que la regi\u00f3n se empecina en ser un polo atractivo para proveedores e inversionistas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El despliegue de infraestructura, tanto de expansiones como de nuevas plantas, que entra en operaciones durante el bienio 2026-2027 no es homog\u00e9neo; responde a las necesidades de cada territorio pero sigue posicionando a las tecnolog\u00edas de tratamiento como imprescindibles para la sostenibilidad ambiental y econ\u00f3mica de los distintos pa\u00edses que la aplican. Mientras el Pac\u00edfico consolida la desalaci\u00f3n multiprop\u00f3sito, el Atl\u00e1ntico lidera el re\u00faso de efluentes tratados.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A este escenario se suman hitos con ciudades costeras como Antofagasta en Chile que se preparan para cerrar el ciclo perfecto del agua. Pues, tras convertirse en la primera urbe de la regi\u00f3n con m\u00e1s de medio mill\u00f3n de habitantes abastecida por agua de mar, ahora avanza con una inversi\u00f3n cercana a los 292 millones de d\u00f3lares adjudicada a <a href=\"https:\/\/www.linkedin.com\/company\/sacyr-chile\/\">Sacyr<\/a> para tratar sus aguas residuales y enviarlas a la industria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>El cambio de paradigma<\/strong><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"682\" height=\"1024\" src=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/WhatsApp-Image-2026-02-12-at-11.02.57-PM-682x1024.jpeg\" alt=\"\" class=\"wp-image-45961\" style=\"aspect-ratio:0.6660299687139799;width:244px;height:auto\" srcset=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/WhatsApp-Image-2026-02-12-at-11.02.57-PM-682x1024.jpeg 682w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/WhatsApp-Image-2026-02-12-at-11.02.57-PM-200x300.jpeg 200w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/WhatsApp-Image-2026-02-12-at-11.02.57-PM-768x1152.jpeg 768w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/WhatsApp-Image-2026-02-12-at-11.02.57-PM-100x150.jpeg 100w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/WhatsApp-Image-2026-02-12-at-11.02.57-PM.jpeg 853w\" sizes=\"auto, (max-width: 682px) 100vw, 682px\" \/><figcaption class=\"wp-element-caption\">Ignacio Rodr\u00edguez, gerente general de DESALA<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Para entender la magnitud de este cambio, ALADYR convers\u00f3 con los protagonistas que est\u00e1n modelando el sector.\u00a0<a href=\"https:\/\/www.linkedin.com\/in\/ignacio84\/\">Ignacio Rodr\u00edguez<\/a>, gerente general de <a href=\"https:\/\/www.linkedin.com\/company\/desala\/\">DESALA<\/a>, explica c\u00f3mo Chile est\u00e1 evolucionando hacia modelos de infraestructura compartida que rompen con la l\u00f3gica del proyecto aislado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>&#8220;El proyecto Desala-Choapa se encuentra terminando una prefactibilidad integrada con su cliente ancla, un proyecto minero de gran escala. Lo particular es que esta fase se hizo de forma coordinada con la ingenier\u00eda de la minera, lo que nos permite fidelizar al cliente y dar sustentabilidad&#8221;<\/em>, detalla Rodr\u00edguez.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para el ejecutivo, 2026 es un a\u00f1o de definiciones:&nbsp;<em>&#8220;Esperamos celebrar pronto el acuerdo de entendimiento para el contrato de compra de agua (WPA) y el co-desarrollo. Nuestra meta es preparar el Estudio de Impacto Ambiental para ingresarlo en 2027.&nbsp;Creemos que el modelo multiprop\u00f3sito es el camino, fomentando la relaci\u00f3n p\u00fablico-privada para que el Estado nos ayude a agilizar los permisos, no reduciendo el est\u00e1ndar ambiental, sino los plazos de respuesta&#8221;<\/em>.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"765\" height=\"1024\" src=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/25ea245c-b026-4747-9759-9b6a7d232a44-2-765x1024.jpg\" alt=\"\" class=\"wp-image-45967\" style=\"aspect-ratio:0.7470817120622568;width:142px;height:auto\" srcset=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/25ea245c-b026-4747-9759-9b6a7d232a44-2-765x1024.jpg 765w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/25ea245c-b026-4747-9759-9b6a7d232a44-2-224x300.jpg 224w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/25ea245c-b026-4747-9759-9b6a7d232a44-2-768x1028.jpg 768w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/25ea245c-b026-4747-9759-9b6a7d232a44-2-100x134.jpg 100w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/25ea245c-b026-4747-9759-9b6a7d232a44-2.jpg 796w\" sizes=\"auto, (max-width: 765px) 100vw, 765px\" \/><figcaption class=\"wp-element-caption\">Eduardo Pedroza,\u00a0director de nuevos negocios de GS Inima y director de ALADYR<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Mientras tanto, en Brasil, el enfoque se centra en la econom\u00eda circular. <a href=\"https:\/\/www.linkedin.com\/in\/pedroza-eduardo\/\">Eduardo Pedroza<\/a>,\u00a0director de nuevos negocios de <a href=\"https:\/\/www.linkedin.com\/company\/gs-inima-brasil\/\">GS Inima<\/a> y director de ALADYR, actualiza sobre el proyecto Aguas de Re\u00faso de Vitoria, que promete ser un referente en la costa atl\u00e1ntica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>&#8220;Ya obtuvimos las licencias ambientales y buena parte de los equipamientos ya est\u00e1n fabricados y esperando instalaci\u00f3n. Las obras ya comenzaron y el proyecto evoluciona seg\u00fan el cronograma. Esperamos inaugurar en 2027&#8221;<\/em>, confirma Pedroza al tiempo que destaca la velocidad con la que el mercado brasile\u00f1o est\u00e1 adoptando el re\u00faso industrial como norma.<\/p>\n\n\n\n<h5 class=\"wp-block-heading\"><strong>Los 10 proyectos h\u00eddricos m\u00e1s importantes (2026-2027)<\/strong><\/h5>\n\n\n\n<p class=\"wp-block-paragraph\">Basado en la capacidad, impacto estrat\u00e9gico y fecha de entrada en operaci\u00f3n (COD), ALADYR presenta la selecci\u00f3n de las 10 iniciativas que definir\u00e1n la seguridad h\u00eddrica de la regi\u00f3n en los pr\u00f3ximos 24 meses.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>1. Planta Desaladora Distrito Norte (<a href=\"https:\/\/www.linkedin.com\/company\/codelco\/\">Codelco<\/a>) &#8211; Chile<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"718\" height=\"538\" src=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/Codelco.png\" alt=\"\" class=\"wp-image-45970\" srcset=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/Codelco.png 718w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/Codelco-300x225.png 300w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/Codelco-100x75.png 100w\" sizes=\"auto, (max-width: 718px) 100vw, 718px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">El proyecto ya presenta m\u00e1s de un 90% de avance<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Capacidad:<\/strong>\u00a01.956 l\/s\u00a0<br><strong>Estado:<\/strong>\u00a0Puesta en Marcha (2026)\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Es, sin duda, el hito del a\u00f1o. Este coloso de la ingenier\u00eda bombear\u00e1 agua desalada desde la costa de Tocopilla hasta m\u00e1s de 3.000 metros de altura para abastecer a tres de las minas m\u00e1s grandes del mundo: Chuquicamata, Radomiro Tomic y Ministro Hales. Su entrada en operaci\u00f3n marca el inicio del fin de la extracci\u00f3n de agua continental en la cuenca de Calama por parte de la estatal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>2. Proyecto C20+ (<a href=\"https:\/\/www.linkedin.com\/company\/collahuasicl\/\">Collahuasi<\/a>) &#8211; Chile<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"904\" height=\"564\" src=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/Collahuasi.png\" alt=\"\" class=\"wp-image-45973\" srcset=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/Collahuasi.png 904w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/Collahuasi-300x187.png 300w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/Collahuasi-768x479.png 768w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/Collahuasi-100x62.png 100w\" sizes=\"auto, (max-width: 904px) 100vw, 904px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">C20+ presenta m\u00e1s de un 92% de avance<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Capacidad:<\/strong>\u00a01.050 l\/s\u00a0<br><strong>Estado:<\/strong>\u00a0Puesta en Marcha (2026)\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ubicada en la Regi\u00f3n de Tarapac\u00e1, esta planta extiende la vida \u00fatil del yacimiento Collahuasi por 20 a\u00f1os m\u00e1s. Destaca por su sistema de impulsi\u00f3n de alta eficiencia energ\u00e9tica, necesario para vencer la geograf\u00eda andina y llevar el recurso a m\u00e1s de 4.000 metros sobre el nivel del mar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>3. Proyecto Aconcagua (<a href=\"https:\/\/www.linkedin.com\/company\/aguas-pac\u00edfico\/\">Aguas Pac\u00edfico<\/a>) &#8211; Chile<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"904\" height=\"418\" src=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/3.-Proyecto-Aconcagua-Aguas-Pacifico-Chile.png\" alt=\"\" class=\"wp-image-45976\" srcset=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/3.-Proyecto-Aconcagua-Aguas-Pacifico-Chile.png 904w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/3.-Proyecto-Aconcagua-Aguas-Pacifico-Chile-300x139.png 300w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/3.-Proyecto-Aconcagua-Aguas-Pacifico-Chile-768x355.png 768w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/3.-Proyecto-Aconcagua-Aguas-Pacifico-Chile-100x46.png 100w\" sizes=\"auto, (max-width: 904px) 100vw, 904px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">En julio de 2025 pasado concluyeron las obras mar\u00edtimas<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Capacidad:<\/strong>\u00a01.000 l\/s\u00a0<br><strong>Estado:<\/strong>\u00a0Operaci\u00f3n (2026)\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Este proyecto rompe moldes al inaugurar la categor\u00eda de &#8220;respaldo sanitario&#8221;. Adem\u00e1s de suministrar agua a la operaci\u00f3n minera Los Bronces, inyectar\u00e1 caudal a la red de agua potable de la sanitaria Esval para beneficiar a m\u00e1s de 25.000 hogares y consolidar la viabilidad social de la desalaci\u00f3n multiprop\u00f3sito.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>4. Planta de Tratamiento R\u00edo Hondo (Naucalpan) &#8211; M\u00e9xico<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"746\" height=\"496\" src=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/4.-Planta-de-Tratamiento-Rio-Hondo-Naucalpan-Mexico.png\" alt=\"\" class=\"wp-image-45979\" srcset=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/4.-Planta-de-Tratamiento-Rio-Hondo-Naucalpan-Mexico.png 746w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/4.-Planta-de-Tratamiento-Rio-Hondo-Naucalpan-Mexico-300x199.png 300w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/4.-Planta-de-Tratamiento-Rio-Hondo-Naucalpan-Mexico-100x66.png 100w\" sizes=\"auto, (max-width: 746px) 100vw, 746px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Las obras contemplan la ampliaci\u00f3n de dos PTARs y la construcci\u00f3n de una nueva<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Capacidad:<\/strong>\u00a0~460 l\/s (40.000 m\u00b3\/d\u00eda)\u00a0<br><strong>Estado:<\/strong>\u00a0Operaci\u00f3n (2026)\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Este proyecto de re\u00faso busca aliviar la presi\u00f3n sobre los acu\u00edferos del Valle de M\u00e9xico. Proporcionar\u00e1 agua regenerada de alta calidad para procesos industriales, liberando agua potable para la poblaci\u00f3n en una de las zonas con mayor estr\u00e9s h\u00eddrico del continente.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>5. Ampliaci\u00f3n Los Pelambres (PAO) &#8211; Chile<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"662\" height=\"414\" src=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/5.-Ampliacion-Los-Pelambres-PAO-Chile.png\" alt=\"\" class=\"wp-image-45982\" srcset=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/5.-Ampliacion-Los-Pelambres-PAO-Chile.png 662w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/5.-Ampliacion-Los-Pelambres-PAO-Chile-300x188.png 300w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/5.-Ampliacion-Los-Pelambres-PAO-Chile-100x63.png 100w\" sizes=\"auto, (max-width: 662px) 100vw, 662px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A mediados del a\u00f1o pasado las obras presentaban m\u00e1s de 20% de avance<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Capacidad:<\/strong>\u00a0+400 l\/s (Total 800 l\/s)\u00a0<br><strong>Estado:<\/strong>\u00a0Construcci\u00f3n \/ Operaci\u00f3n (2027)\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.linkedin.com\/company\/antofagasta-plc\/\">Antofagasta Minerals<\/a> duplica su apuesta por la desalaci\u00f3n con esta expansi\u00f3n para que su\u00a0\u00a0operaci\u00f3n sea un 90% con agua de mar hacia finales de la d\u00e9cada e independizarse de las fuentes convencionales del valle del Choapa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>6. \u00c1guas de Re\u00faso de Vitoria &#8211; Brasil<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"682\" height=\"232\" src=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/6.-Aguas-de-Reuso-de-Vitoria-Brasil.png\" alt=\"\" class=\"wp-image-45985\" srcset=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/6.-Aguas-de-Reuso-de-Vitoria-Brasil.png 682w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/6.-Aguas-de-Reuso-de-Vitoria-Brasil-300x102.png 300w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/6.-Aguas-de-Reuso-de-Vitoria-Brasil-100x34.png 100w\" sizes=\"auto, (max-width: 682px) 100vw, 682px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Ya inici\u00f3 la fase de construcci\u00f3n y se espera la entrada en operaciones para el a\u00f1o que viene<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Capacidad:<\/strong>\u00a0360 l\/s de agua para uso industrial (Fase 1)\u00a0<br><strong>Estado:<\/strong>\u00a0Construcci\u00f3n (Inauguraci\u00f3n 2027)\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Liderado por <a href=\"https:\/\/www.linkedin.com\/company\/gs-inima-brasil\/\">GS Inima<\/a>, este proyecto transformar\u00e1 los efluentes sanitarios de la ciudad en agua de proceso para una planta de ArcelorMittal, entre otros clientes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>7. Expansi\u00f3n PTAR Ca\u00f1averalejo (<a href=\"https:\/\/www.linkedin.com\/company\/emcali-eice-esp\/\">EMCALI<\/a>) &#8211; Colombia<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"432\" src=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/7.-Expansion-PTAR-Canaveralejo-EMCALI-Colombia.png\" alt=\"\" class=\"wp-image-45988\" srcset=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/7.-Expansion-PTAR-Canaveralejo-EMCALI-Colombia.png 768w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/7.-Expansion-PTAR-Canaveralejo-EMCALI-Colombia-300x169.png 300w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/7.-Expansion-PTAR-Canaveralejo-EMCALI-Colombia-100x56.png 100w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Se\u00a0\u00a0han venido ejecutando proyectos de optimizaci\u00f3n como la rehabilitaci\u00f3n de las bombas tornillo<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Capacidad:<\/strong>\u00a0~1.385 l\/s (119.664 m\u00b3\/d)\u00a0<br><strong>Estado:<\/strong>\u00a0Planificado (Adjudicaci\u00f3n 2025 \/ Operaci\u00f3n 2027)\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esta iniciativa en Colombia marca un avance significativo en la gesti\u00f3n del agua residual. La expansi\u00f3n de la planta Ca\u00f1averalejo est\u00e1 dise\u00f1ada para tratar aguas residuales con un enfoque prioritario en el re\u00faso para riego paisaj\u00edstico y recuperaci\u00f3n ambiental.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>8. Proyecto Santo Domingo SWRO (<a href=\"https:\/\/www.linkedin.com\/company\/capstone-copper-chile\/\">Capstone Copper<\/a>) &#8211; Chile<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"698\" height=\"464\" src=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/8.-Proyecto-Santo-Domingo-SWRO-Capstone-Copper-Chile.png\" alt=\"\" class=\"wp-image-45991\" srcset=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/8.-Proyecto-Santo-Domingo-SWRO-Capstone-Copper-Chile.png 698w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/8.-Proyecto-Santo-Domingo-SWRO-Capstone-Copper-Chile-300x199.png 300w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/8.-Proyecto-Santo-Domingo-SWRO-Capstone-Copper-Chile-100x66.png 100w\" sizes=\"auto, (max-width: 698px) 100vw, 698px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">El proyecto ya obtuvo la aprobaci\u00f3n ambiental<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Capacidad:<\/strong>\u00a0366 l\/s (31.622 m\u00b3\/d)\u00a0<br><strong>Estado:<\/strong>\u00a0Planificado (Operaci\u00f3n 2027\/2029)\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ubicada en Diego de Almagro, esta planta de \u00f3smosis inversa es vital para el desarrollo industrial de la zona. Aunque los registros de <a href=\"https:\/\/www.linkedin.com\/company\/cochilco\/\">Cochilco<\/a> proyectan su operaci\u00f3n para 2029, fuentes especializadas como GWI sit\u00faan su entrada en l\u00ednea para 2027, respaldadas por la reciente obtenci\u00f3n de su aprobaci\u00f3n ambiental (marzo 2025). Con una inversi\u00f3n estimada de USD 250 millones, se espera que la construcci\u00f3n inicie en octubre de este a\u00f1o, consolidando la infraestructura h\u00eddrica necesaria para el distrito minero.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>9. Optimizaci\u00f3n de Desaladora Candelaria &#8211; Chile<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"904\" height=\"564\" src=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/candelaria.png\" alt=\"\" class=\"wp-image-45994\" srcset=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/candelaria.png 904w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/candelaria-300x187.png 300w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/candelaria-768x479.png 768w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/candelaria-100x62.png 100w\" sizes=\"auto, (max-width: 904px) 100vw, 904px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Seg\u00fan catastro de proyectos de Cochilco, este proyecto suma 100 litros por segundo a su capacidad instalada<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Capacidad:<\/strong>\u00a0+100 l\/s\u00a0<br><strong>Estado:<\/strong>\u00a0Operaci\u00f3n (2026)\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.linkedin.com\/company\/lundin-mining-corporation\/\">Lundin Mining<\/a> optimiza su planta existente en Caldera, para un incremento de caudal cr\u00edtico que pretende acompa\u00f1ar la extensi\u00f3n de sus operaciones hasta 2040. Pionera en la regi\u00f3n, la planta tiene una capacidad nominal para producir hasta 500 litros por segundo de agua desalinizada.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>10. Planta Desaladora Arica (<a href=\"https:\/\/www.linkedin.com\/company\/aguas-del-altiplano\/\">Aguas del Altiplano<\/a>) &#8211; Chile<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"904\" height=\"540\" src=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/10.-Planta-Desaladora-Arica-Aguas-del-Altiplano-Chile.png\" alt=\"\" class=\"wp-image-45997\" srcset=\"https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/10.-Planta-Desaladora-Arica-Aguas-del-Altiplano-Chile.png 904w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/10.-Planta-Desaladora-Arica-Aguas-del-Altiplano-Chile-300x179.png 300w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/10.-Planta-Desaladora-Arica-Aguas-del-Altiplano-Chile-768x459.png 768w, https:\/\/aladyr.net\/wp-content\/uploads\/2026\/02\/10.-Planta-Desaladora-Arica-Aguas-del-Altiplano-Chile-100x60.png 100w\" sizes=\"auto, (max-width: 904px) 100vw, 904px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Aguas del Altiplano ingres\u00f3 al Servicio de Evaluaci\u00f3n Ambiental (SEA)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Capacidad:<\/strong>\u00a0200 l\/s (17.280 m\u00b3\/d)\u00a0<br><strong>Estado:<\/strong>\u00a0Planificado (Adjudicaci\u00f3n 2026 \/ Operaci\u00f3n 2027)\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ubicada en el extremo norte de Chile, esta planta es vital para asegurar el suministro de agua potable en una zona de extrema aridez. Aguas del Altiplano proyecta recibir la aprobaci\u00f3n ambiental durante el primer trimestre de 2026, lo que permitir\u00e1 avanzar hacia la adjudicaci\u00f3n este mismo a\u00f1o. Utilizar\u00e1 tecnolog\u00eda de \u00f3smosis inversa para tratar agua de mar y abastecer a la red municipal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Existen proyectos claves para la transformaci\u00f3n del escenario H\u00eddrico de Latinoam\u00e9rica en los pr\u00f3ximos a\u00f1os. Se trata de una selecci\u00f3n de infraestructura pronta a entrar en operaciones y que agrega una considerable cantidad de metros c\u00fabicos a la capacidad instalada regional de desalaci\u00f3n y re\u00faso de agua.\u00a0 PRENSA ALADYR \/ PERIODISTA DIEGO ORTU\u00d1O. Al cierre de 2025, la capacidad instalada &#8230;<\/p>\n","protected":false},"author":3958,"featured_media":46006,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[62],"tags":[],"class_list":["post-45960","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"_links":{"self":[{"href":"https:\/\/aladyr.net\/en\/wp-json\/wp\/v2\/posts\/45960","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aladyr.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aladyr.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aladyr.net\/en\/wp-json\/wp\/v2\/users\/3958"}],"replies":[{"embeddable":true,"href":"https:\/\/aladyr.net\/en\/wp-json\/wp\/v2\/comments?post=45960"}],"version-history":[{"count":6,"href":"https:\/\/aladyr.net\/en\/wp-json\/wp\/v2\/posts\/45960\/revisions"}],"predecessor-version":[{"id":46013,"href":"https:\/\/aladyr.net\/en\/wp-json\/wp\/v2\/posts\/45960\/revisions\/46013"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aladyr.net\/en\/wp-json\/wp\/v2\/media\/46006"}],"wp:attachment":[{"href":"https:\/\/aladyr.net\/en\/wp-json\/wp\/v2\/media?parent=45960"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aladyr.net\/en\/wp-json\/wp\/v2\/categories?post=45960"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aladyr.net\/en\/wp-json\/wp\/v2\/tags?post=45960"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}